BastropBuilder.com
Bids at 184 Clover Road Cedar Creek Texas

Work revised 11/04/2004 09:08 AM
Paul Walhus and Dorothy Epp
184 Clover Rd, Cedar Creek, TX 78612 
512-581-9617 or 699-4000 Wmobile or 680-4888 DotMobile

Framing  

  1. change 6 - 3050 windows in kitchen to 3030 windows (save 3050 windows for foundation)
  2. put 3030 windows in downstairs kitchen in same location as upstairs kitchen above sink
  3. change upstairs small window above kitchen sink to 3030
  4. change downstairs kitchen wall to be same as upstairs wall with bar window and door
  5. remove two walls in center area downstairs and replace with 14" laminated beams
  6. change w/d room door off upstairs kitchen to 2-8
  7. fur downs in bathrooms as required by plumber
  8. move 4 doors - kitchen, first floor ne bedroom, first floor laundry, 2nd floor laundry - we must be able to fit a side by side washer dryer in both kitchen closets
  9. Half wall around upstairs loft

Floors

  1. install 70 sheets of 3/4" t&g plywood
  2. screw, countersink and putty
  3. final job after all painting and everything else is done is to sand, stand and put a heavy coat of clear varathane down on floors, esp. in kitchen and bath areas (wet).

Plumbing  

  1. bath downstairs toilet
  2. bath downstairs tub / shower
  3. bath downstairs vanity
  4. bath up remove old h2o heater
  5. bath upstairs toilet
  6. bath upstairs tub / shower
  7. bath upstairs vanity
  8. kit upstairs dishwasher hookups
  9. kit upstairs icemaker hookup
  10. kit upstairs sink
  11. kit downstairs w/d hookup
  12. kit downstairs d/w hookups
  13. kit downstairs icemaker hookup
  14. kit downstairs sink
  15. kit downstairs w/d hookup
  16. basement drain for gray water line 50'
  17. basement pressure tank (Leuder Pump)
  18. basement set 40 gal h2o heater for downstairs
  19. basement set 50 gal h20 heater for upstairs
  20. vent additional vent for west side bathrooms
  21. vent existing vent through roof upstairs
  22. replace cast iron tub downstairs with tub/shower unit
  23. add 4" septic line to aerobic system

materials
1   50 gallon hot water heater
2   dishwasher hookups
2   icemaker hookup
2   toilet
3   tub / shower
3   tub shower faucets
3   vanity w sink
2   vents
3   vanity fixtures
1   Leuder Pressure pump

plumbing specifications

  1. kit on 2nd floor - sink, ice maker line, washer and dryer in closet, dishwasher, wet bar
  2. kit on 1st floor - sink, ice maker line, washer and dryer in closet, dishwasher, wet bar
  3. bathroom 2 in 2nd floor loft house - install tub/shower unit, cabinet and sink, toilet
  4. hot water heater - move from 2nd floor loft apartment to pier and beam area basement
  5. bathroom 1 on 1st floor - tub/shower unit and cabinet sink
  6. fix drain pipes basement and provide for grey water drainage 40' underground drain line
  7. install all necessary stacks
  8. pressure boost and tank

Electrical parts

quant cost ext item
10 0 gfi
50 0 plugs
25 0 switch
50 0 catv
2 0 30 amp
250 0 10-3 wire
250 0 12-2 wire
250 0 12-3 wire
1 0 red wire nuts
10 0 w/p gfi covers
8 0 2/p plug covers
25 0 ethernet outlets
15 0 splitters
10 0 single plastic boxes
4 0 double plastic boxes

Cabinets - see trim bid page

and see kitchen pictures which include plan diagram

  1. All cabinets downstairs kitchen
  2. shelves in both laundry rooms
  3. bathroom cabinets 4' cabinet for bathroom sink.  See diagram on plumbing bid.
  4. Finish upstairs kitchen cabinets, and build overhead cabinets
kitchen upstairs
18 ft 2f overhead kit cabinets
28 ft 2f base kit cabinets
6 tot small drawers
10 tot cabinet doors

The upstairs kitchen needs a few more cabinets in the corner with a lazy susan and drawers, shelves, and cabinet doors.

The downstairs kitchen is from scratch and the design can improve upon the upstairs design if possible.

Trim

  1. All baseboard - approx 430 running feet
  2. Window Sills 11 - 3' sills and 1 - 2' sill
  3. Door Trim - about 16 doors total
  4. Doors - 12 2-10 doors and 2 2-1 doors
  5. Stairway Railing - must look upscale!

Drywall

  1. Repair Drywall in kitchens, bathrooms and central first floor room
  2. Repair drywall around doors and widows that we change out

Painting

  1. prime and paint inside - same color everywhere off white
  2. paint doors white enamel outside
  3. paint inside doors and trim - different color

Road

  1. 330 feet of caliche and limestone road
  2. 6 parking spaces and circle

Roof

  1. fix tin roof over back deck off front cottage - now
  2. change tin roof over cottage to comp - distant future